What the Former Weddington Site on Whitsett Opens to Studio City This Spring

On the evening of October 19, the new field lights at 4141 Whitsett Avenue came on for testing. They were turned off by 8 p.m. The tennis court lights stayed on until 9 p.m. Harvard-Westlake's construction bulletin says they match the cutoffs that will apply once the site opens. If you were on Valley Spring Lane or Bellaire Avenue that night, you saw the park's future evening hours before the gates opened.

Those lights are the easiest clue to how the former Weddington Golf & Tennis property will work for neighbors. Harvard-Westlake River Park runs on a school-day clock. The park and clubhouse will be open to everyone all day. The courts, pool, track and fields are another matter. The public gets them around the edges of the school schedule, and the best of those openings come early in the morning.

Where Things Stand Heading Into Thanksgiving

At the Studio City Neighborhood Council meeting on October 28, Ari Engelberg of Harvard-Westlake said River Park construction was about 99% complete. According to the draft minutes, he said public amenities were expected to open around March 1, 2027, and that community open houses are planned. The HW Chronicle reported in August that the earlier fall target moved to early 2027 because city inspections and a Certificate of Occupancy were still pending.

The change since late October is on the street. The school's October 30 construction update said the permitted street work on Whitsett would be finished by Saturday, October 31. Valley Spring and Whitsett would then go back to normal traffic, and the construction fencing would move back to the property line. The week before, the school said the work was running two weeks ahead of schedule.

That street work was scheduled to begin September 12, with a partial lane closure on Whitsett from Valley Spring to the fire station, and the school estimated about two months for it. The plan was to repair a sidewalk that had been uprooted 12 inches or more in places and to move it farther onto the school's property to widen the public right-of-way. It also called for more landscaping between the sidewalk and the street, including native oaks. Along Valley Spring and Bellaire, the upper half of the acoustic fence came down in late September. The lower half stays up while construction wraps.

Inside the fence, the late-October to-do list was mostly finishing work. Crews were installing artificial turf on Field A and putting together metal bleachers at the field and the pool. The school warned that the bleacher work might make a metallic sound.

The All-Day Part: The Park and the Clubhouse

The part of River Park that doesn't depend on the school calendar is the park. According to Harvard-Westlake's River Park FAQ, the park and clubhouse will be open free to the public every day of the year, 7 a.m. to 9 p.m. The FAQ calls it a 6-acre park. The 2023 city approval documents specify 5.4 acres of publicly accessible open space, with landscaped paths connecting to the Zev Yaroslavsky LA River Greenway.

The school's project overview lists what that space includes: plazas, wooded areas, trails, seating, public walking and jogging paths, the clubhouse, a café and a putting green. The café is Café Southwest, which longtime Weddington regulars will remember. The FAQ says it will reopen in the remodeled clubhouse with a new kitchen and more seating.

The Greenway connection makes the park part of an existing route. The FAQ names two public ways in: the main pedestrian and visitor entrance on Whitsett, and the Zev Yaroslavsky LA River Greenway. If you already walk or run the river path, River Park becomes a place to stop along it, with shade, a bench and eventually a coffee.

The School-Clock Part: Courts, Pool, Track and Fields

This is where the October light tests matter. The FAQ says the public can use the eight tennis courts whenever Harvard-Westlake isn't using them, which generally means 7 a.m. to 3 p.m. and 6 p.m. to 9 p.m. The hours from 3 to 6 p.m. belong to the school. The court lights go off at 9 p.m., the same time the tested lights did on October 19.

The pool and the track have the narrowest public windows. Individual lap swimming is scheduled for weekdays from 7 to 9 a.m. Individual use of Field B and the track is scheduled for weekdays from 7 a.m. to noon. Both run September through May. Community groups can use the athletic fields, pool and gym when school athletes aren't using them.

Put those hours together and the best public time is weekday mornings. Between 7 and 9 a.m. on a weekday, you could swim laps, run the track and hit tennis balls on the same campus. The courts and track stay open to the public through the late morning. By mid-afternoon, only the park itself is public.

The calendar matters too. Individual swim and track use follows a September-to-May season. If the park opens around March 1, the first season of public lap swimming and track use would run about three months before pausing for summer. Early-morning swimmers in the neighborhood have a reason to mark the spring opening.

What Stays From Weddington

Weddington became Los Angeles Historic-Cultural Monument No. LA-1240 in September 2021. The physical pieces the city's report names include the clubhouse, the putting green, the golf-ball lights and the brick wall. The approved plan swapped the golf course, driving range and tennis facility for athletic fields and courts, and the clubhouse, putting green, golf-ball lights and brick wall stayed. At the council's August 26 meeting, the school described restoration work on the historic golf-ball structures along with the landscaping.

The city's historic report also notes that the property used to be called the Studio City Golf and Tennis Club. So the clubhouse, the putting green, the brick wall along Whitsett and the golf-ball lights should all be recognizable to anyone who knew the old place.

Arriving, and the Quiet Side of the Fence

Parking is on site. The FAQ lists 386 below-grade spaces plus 17 surface spaces, all reached from Whitsett. It says visitors are not to park on neighborhood streets and that staff will check visitors. For anyone already on foot or on the Greenway, the river entrance avoids the garage altogether.

The school's FAQ also describes the sound design facing the homes to the north. An earthen berm runs along much of the north edge with an eight-foot solid sound wall. Thick landscaping lines that side, and the athletic fields sit more than 100 feet from homes. With the 8 p.m. field-light cutoff on top of that, evening activity on the fields is set to end earlier than at the courts.

Until the gates open, Harvard-Westlake keeps a construction hotline at 818-487-6611 and an inbox at [email protected] for questions about the site. The construction updates page is where the school has posted each new phase, and it is the likeliest place for open-house dates to appear. If you're putting together your own Studio City week, River Park fits the same part of the Valley as the Sunday market on Ventura Place. There's more on the neighborhood in our Studio City guide.

If you live near Whitsett, Valley Spring or Bellaire and want to know how a new public park next door shows up when homes on your street sell, Kati Cattaneo is following River Park's opening closely and is happy to walk your block with you before spring. Work With Kati.

Work With Kati

Her clients value her reliability, unwavering work ethic, indomitable positivity, genuine spirit, and perseverance to go above and beyond before, during, and even after escrow closes. Her ability to make one of the most significant transactions of a persons life feel not only effortless but personal, has led to a business that is almost entirely referral based. Contact her now!